Dear Aspirants,
As IBPS has released the its official calendar of Online CWE for RRBs and PSBs examinations 2019, so its high time to start preparations for the coming year. Looking at the calendar, we have now started subject-wise quizzes for the exam. It will include quizzes of all the subjects- Quantitative Aptitude, English, Reasoning and Computer. All these quizzes will be strictly based on the latest pattern of all the upcoming competitive exams and will be beneficial for your preparations. So, keep following the quizzes which will provide you a set of 10 questions daily.
Here, we are providing you important questions of Quantitative Aptitude for all banking exams.
Q1. What would be the compound interest on an amount of Rs. 17500 at the rate of 20% per annum at the end of 3 years?
17500 रुपए की राशि पर 20 प्रतिशत प्रतिवर्ष की दर से ३ वर्ष के अंत में चक्रवृद्धि ब्याज क्या होगा?
(1) Rs. 12240
(2) Rs. 12450
(3) Rs. 12580
(4) Rs. 12740
(5) Rs. 12830
Q2. Prakash is thrice as good as Neeraj. They together can do a job in 16 days, in how many days will Neeraj finish the work alone?
प्रकाश नीरज से तीन गुना बेहतर है। वे एक साथ एक काम 16 दिनों में कर सकते हैं, नीरज अकेले उस काम को कितने दिनों में समाप्त कर सकता है?
(1) 46 days
(2) 52 days
(3) 64 days
(4) 68 days
(5) 72 days
Q3. A shopkeeper bought 30 kg of rice at the rate of Rs.70 per kg and 20 kg of rice at the rate of Rs.70.75 per kg. If he mixed the both brand of rice and sold the mixture at Rs 80.50 per kg, what is his gain?
एक दुकानदार 70 रूपए प्रति किग्रा की दर से 30 किलो चावल और 70.75 रूपए प्रति किलो की दर से 20 किलो चावल खरीदता है। यदि वह दोनों किस्म के चावल को मिला देता है और मिश्रण को 80.50 रूपए प्रति किलो की दर से बेचता है, तो उसका लाभ क्या है?
(1) Rs. 410
(2) Rs. 430
(3) Rs. 470
(4) Rs. 510
(5) Rs. 540
Q4. Ujjwal and Naveen start cycling from a point X with speeds of 16 km/hr. and 24 km/hr. respectively and reach another point Y. If Naveen starts 60 min after Ujjwal and reaches 60 min. before Ujjwal, what is the distance between X and Y?
उज्ज्वल और नवीन बिंदु X से क्रमशः 16 किमी / घंटा और 24 किमी /घंटा की चाल से एक अन्य बिंदु Y पर पहुंचने के लिए साइकिल चलाना शुरू करते हैं। यदि नवीन, उज्जवल के 60 मिनट बाद प्रारंभ करता है और उज्जवल से 60 मिनट पहले पहुँच जाता है तो X और Y के बीच की दूरी क्या है?
(1) 69 km
(2) 73 km
(3) 86 km
(4) 92 km
(5) 96 km
Q5. What would be the cost of fencing of a rectangle whose length is 20% more than its breadth and area of rectangle is 900 m²?
एक आयत की बाड़ लगाने की लागत क्या होगी जिसकी लम्बाई चौड़ाई की तुलना में 20% अधिक है और आयत का क्षेत्रफल 900 मीटर² है?
(1) Rs. 380
(2) Rs. 400
(3) Rs. 415
(4) Rs. 450
(5) Cannot be determine
Q6. What is the respective ratio between times taken by a train 440 m. long to cross an electric pole and a bridge of 60 m. long?
440 मीटर लम्बी एक ट्रेन द्वारा बिजली के एक खंभे और 60 मीटर लम्बे एक पुल को पार करने में लगे समय के बीच क्रमशः अनुपात क्या है?
(1) 22 : 25
(2) 25 : 22
(3) 11 : 25
(4) 22 : 35
(5) 22 : 23
Q-(7-10) Read the following table carefully and answer the questions given below.
Marks obtained by 6 students in different subjects in an examination.
निम्न ग्राफ का ध्यान पूर्वक अध्ययन कर दिए गए प्रश्नों के उत्तर दीजिए।
एक परीक्षा में विभिन्न विषयों में 6 छात्रों द्वारा प्राप्त अंक।
Q7. What is average percentage marks obtained by all students in Maths? (Up to two decimal places)
सभी छात्रों द्वारा गणित में प्राप्त औसत प्रतिशत अंक क्या है?(दशमलव के दो स्थान तक )
(1) 78.83%
(2) 80.85%
(3) 81.44%
(4) 83.84%
(5) 84.59%
Q8. What is the average marks obtained by all students in Hindi?
हिन्दी में सभी छात्रों द्वारा प्राप्त औसत अंक क्या है?
(1) 32.8
(2) 34.12
(3) 38.88
(4) 40.5
(5) 43.25
Q9. What is the difference between the marks obtained by Qareena and Divakar in all subjects together?
सभी विषयों को मिलाकर करीना और दिवाकर द्वारा प्राप्त अंकों के बीच अंतर क्या है?
(1) 55
(2) 59
(3) 63
(4) 65
(5) 69
Q10. What is the approximate percentage marks obtained by Tarun in all subjects?
तरुण द्वारा सभी विषयों में प्राप्त लगभग प्रतिशत अंक क्या हैं?
(1) 72%
(2) 78%
(3) 81%
(4) 83%
(5) 87%
Answer key-
Q1. (4)
C.I. =
= 17500 × 0.728
= Rs. 12740
Q2. (3)
Let Prakash does a work in x days so Neeraj will do in 3x days.
=> x =
Neeraj will complete the job in 3 × = 64 days
Q3. (4)
Gain = (50 x 80.50) – (30 x 70 + 20 x 70.75)
= 4025 – (2100 + 1415)
= 4025 – 3515 => Rs. 510
Q4. (5)
Let distance between X and Y = a km.
According to question-
a = 96 km.
Q5. (5)
cost per square meter is not given so cannot be determine.
Q6. (2)
Since, Speed of train is constant
Q7. (3)
Average percent mark =
= 81.44%
Q8. (4)
Average marks = = 40.5
Q9. (4)
Difference = 467 – 402 = 65
Q10. (2)
Required percentage = =78% (Approx.)