mahendras

| Join Mahendras Telegram Channel | Like Mahendras Facebook Page | Online Admission | Download Mahendras App

Now Subscribe for Free videos

Subscribe Now

Quantitative Aptitude Quiz For SBI PO | 03-05-19

Mahendra Guru
Quantitative Aptitude Quiz For SBI PO | 03-05-19
Dear Readers,

As SBI has released the much-awaited vacancies for the post of Probationary Officers, we have launched subject-wise quizzes for the exam. It will include quizzes of all the subjects- Quantitative Aptitude, English, Reasoning and Computer. All these quizzes will be strictly based on the latest pattern of SBI PO exam and will be beneficial for your preparations. So, keep following the quizzes which will provide you a set of 10 questions daily.


Here, we are providing you important questions of Quantitative Aptitude for SBI PO 2019 exam.

Q. (1 – 5): In the following number series, a term is wrong. Find that wrong term.

निम्न संख्या – श्रृंखला में एक पद गलत है । गलत पद ज्ञात कीजिये ।

Q.1. 25 75 339 1958 13891 110567
(1) 1958
(2) 339
(3) 13891
(4) 110567
(5) 75

Q.2. 125 255 477 872 1392 2130
(1) 125
(2) 255
(3) 477
(4) 1392
(5) 2130

Q.3. 88 44 176 11 2836
(1) 88
(2) 44
(3) 2836
(4) 176
(5) 11

Q.4. 14 15 20 39 40.8 54.8
(1) 20
(2) 39
(3) 40.8
(4) 54.8
(5) 14

Q.5. 786 759 723 678 624 584
(1) 786
(2) 759
(3) 723
(4) 624
(5) 584

Q.6. There are two numbers such that the sum of twice the first number and thrice the second number is 300 and the sum of thrice the first number and twice the second number is 265. Which is the larger number?

दो संख्याएं ऐसी हैं कि पहली संख्या का दोगुना और दूसरी संख्या का तीन गुना 300 है और पहली संख्या का तीन गुना और दूसरी संख्या का दोगुना 265 है। कौन सी बड़ी संख्या है?
(1) 24
(2) 39
(3) 85
(4) 74
(5) None of these/इनमें से कोई नहीं

Q.7. 4 men can complete a piece of work in 2 days. 4 women can complete the same piece of work in 4 days whereas 5 children can complete the same piece of work in 4 days. If 2 men, 4 women and 10 children work together, in how many days can the work be completed?

4 पुरुष 2 दिनों में एक काम को पूरा कर सकते हैं । 4 महिलाएं 4 दिनों में उसी काम को पूरा कर सकती हैं जबकि 5 बच्चे 4 दिनों में उसी काम को पूरा कर सकते हैं। यदि 2 पुरुष, 4 महिलाएं और 10 बच्चे एक साथ काम करते हैं, तो काम कितने दिन पूरा हो सकता है?
(1) 1 days
(2) 3 days
(3) 2 days
(4) 4 days
(5) None of these/इनमें से कोई नहीं

Q.8. The compound interest earned by Kanishk on a certain amount at the end of two years at the rate of 8 p.c.p.a. was Rs.1414.40. What was the total amount that Kanishk got back at the end of two years in the form of principal plus interest earned? 

8 प्रतिशत वार्षिक ब्याज की दर से दो वर्ष के अंत में एक निश्चित राशि पर कनिष्क द्वारा अर्जित चक्रवृद्धि ब्याज 1414.40 रुपये था। मूलधन और ब्याज के योग के रूप में दो वर्ष के अंत में नीतू को वापस मिलने वाली कुल राशि क्या थी?
(1) Rs.9414.40
(2) Rs.9914.40
(3) Rs.9014.40
(4) Rs.8914.40
(5) None of these/इनमें से कोई नहीं

Q.9. Out of two squares, the perimeter of the first is 12 metres and the perimeter of the second is 5 metres. Find out the perimeter of the third square, whose area is equal to the sum of the areas of the both squares.

दो वर्गों में से, पहले का परिमाप 12 मीटर है और दूसरा परिमाप 5 मीटर है । तीसरे वर्ग के परिमाप का पता लगाएं, जिसका क्षेत्रफल दोनों वर्गों के क्षेत्रफलों के योग के बराबर है।
(1) 24 m. /मी.
(2) 30 m. /मी.
(3) 26 m. /मी.
(4) 72 m. /मी.
(5) None of these/इनमें से कोई नहीं

Q.10. A boat covers 24 km upstream and 28 km downstream in 6 hours, while it cover 30 km upstream and 21 km downstream in hours. Find the speed of the boat in still water and speed of the stream. 

एक नाव में 24 किमी धारा के प्रतिकूल और 28 किमी धारा के अनुकूल 6 घंटे में तय करती है, जबकि यह 30 किमी धारा के प्रतिकूल और 21 किमी धारा के अनुकूल घंटे में तय करती है । नाव की स्थिर जल में चाल और धारा की गति ज्ञात कीजिये ।
(1) 6 km/hr. (किमी. /घंटा)
(2) 8 km/hr. (किमी. /घंटा)
(3) 10 km/hr. (किमी. /घंटा)
(4) 12 km/hr. (किमी. /घंटा)
(5) None of these/इनमें से कोई नहीं

Answer Key:
Q1. (1) × 4 – 52, × 5 – 62,  × 6 – 72,  × 7 – 82,  × 8 – 92,    

Q2. (4) + {5(52 + 1)}, + {6(62 + 1)}, + {7(72 + 1)}, + {8(82 + 1)}, + {9(92 + 1)}

Q3. (3) × 0.5, ÷ 0.25, × 0.0625, ÷ 0.00390625

Q4. (2) ÷ 2 + (32 – 1), ÷ 3 + (42 – 1), ÷ 4 + (52 – 1), ÷ 5 + (62 – 1), ÷ 6 + (72 – 1),

Q5. (5) – (63 – 36), – (73 – 37), – (83 – 38), – (93 – 39), – (40 – 04)

Q6. (4) Let first number be x and second number be y/माना पहली संख्या x तथा दूसरी संख्या y है।
According to the question/प्रश्नानुसार,
2x + 3y = 300 … (I)
and/और 3x + 2y = 265 … (II)
On solving (I) and (II), we get/ (I) और (II) को हल करने पर, हम प्राप्त करते हैं
x = 39, y = 74
Larger number/बड़ी संख्या = 74 

Q7. (5) 4M × 2 = 4 W × 4 = 5 C × 4
2M = 4W = 5C
2M + 4W + 5C = 2M + 2M + 2M = 6M
Required number of days/अभीष्ट दिनों की संख्या 
days/दिन

Q8. (2) Let amount be Rs.100/माना धनराशि 100 रु. है ।
Compound interest for the first year/पहले वर्ष के लिए चक्रवृद्धि ब्याज = Rs.8
Compound interest for the second year/दूसरे वर्ष के लिए चक्रवृद्धि ब्याज = Rs.8 + Rs.0.64
Total compound interest/कुल चक्रवृद्धि ब्याज = Rs.16.64
According to the question/प्रश्नानुसार,
16.64 = 1414.40 
1 = 85
100 = 8500
Total amount/कुल धनराशि = 8500 + 1414.40 = 9914.40

Q9. (3) A2 =
A2 =
A = 6.5 
Perimeter of the third square/तीसरे वर्ग का परिमाप = 6.5 × 4 = 26 m. /मी.

Q10. (3)
From (I) and (II), we get,
u = 6, v = 14 
Speed of the boat = 10 km/hr. (किमी. /घंटा)

Copyright © 2023 www.mahendraguru.com All Right Reserved by Mahendra Educational Pvt . Ltd.