mahendras

Subscribe Mahendras Youtube Channel | Join Mahendras Telegram Channel | Like Mahendras Facebook Page | Online Admission | Download Mahendras App

Now Subscribe for Free videos

Subscribe Now

Quantitative Aptitude Quiz For IBPS PO Mains | 20-11-19

Mahendra Guru
Quantitative Aptitude Quiz For IBPS PO Mains | 20-11-19
Dear Students,

First of all Congratulations to all the IBPS PO Prelims qualified candidates. Mahendras has started special quizzes for IBPS PO Mains examination so that you can practice more and more to secure your spot in the list of mains examination qualified candidates. This IBPS PO Mains special quiz series will mold your preparations in the right direction and the regular practice of these quizzes will be really very helpful in scoring good marks in the Examination.


Instruction:- The following  table graph is prepared by a contractor to complete his government contract in  which type of work, efficiency of men, women, and boy are mentioned, but due to rain some of his incomplete data is recovered and he is facing problem to assign task and unble to pay mony to his labour. Lets help him out to find the missing data.

निर्देश:- निम्नलिखित टेबल ग्राफ एक ठेकेदार द्वारा अपने सरकारी ठेके को पूरा करने के लिए बनाया गया है, जिसमे कार्य के प्रकार, पुरुष, महिला और लडको की क्षमतायें दी गयी है. लेकिन बारिश के कारण उसकी कुछ सूचनायें ही मिल पायी, जिस वजह से उसे कामगारों को काम देने में परेसानी का सामना करना पड़ रहा है.खोयी हुयी जानकारी प्राप्त करने में उसकी मदद करते है ?



Type of work/कार्य के प्रकार
Eff. Of MEN/
पुरुष की क्षमता
Eff. Of WOMEN
महिला की क्षमता
Eff. Of BOY/ लडके की क्षमता Total contracts/ कुल ठेका    Combined efficiency of all of them (Men + Women + boy) / सभी की क्षमता
Construction b a 2b 120 3a
Electrification 2a 4b 3a 288 7a + 2
Painting 3a – 2b 2b b 160 11
Designing 3b – 1 2a a 240 14
Wood work a+1 2a ssc-maths-quiz-20-11-19 - ssc-maths-quiz-20-11-19 360 5a

Q.1:- If contractor employed 2 men, 1 women and 3 boy for wood work and they work for 10 days, but suddenly work is increase which is equal to 108.33% of the construction work. Now in how many days the whole work will be completed if as mention before men and women increase their efficiency by 50% and a boy increases his efficiency by 100%. 

(1) 10 day/दिन
(2) ssc-maths-quiz-20-11-19 day/दिन
(3) ssc-maths-quiz-20-11-19 day/दिन
(4) ssc-maths-quiz-20-11-19 Day/दिन
(5) None of these/ इनमे से कोई नहीं


Q.2 what is the combined ratio of efficiency of men, women from construction, electrification and painting to the combined efficiency of men and boy from painting, designing from wood work? 

(1) 6 : 7
(2)  3 :8
(3)  5 : 6
(4) 7 : 6
(5) None of these/इनमे से कोई नहीं


(3):- Q.1:- Contractor employed 1 men, 1 women, and 1 boy for wood work, And same number of worker for electrification. What is ratio of number of days required to complete both the work?
यदि ठेकेदार ने 1 आदमी , 1 महिला और 1 बच्चे को लकड़ी के काम के लिए लगता है, और उतने ही श्रमिकों को विधुतीकरण के लिए लगता है. तो दोनों कामों को समाप्त करने में लगे दिनों का अनुपात ज्ञात करें.

  1.  Can’t be determined/ ज्ञात नहीं कर सकते
  2.  13 :27
  3.  12 :23
  4.  23: 12
  5.  None of these/ इनमे से कोई नहीं
Q.4:- Time taken by a man to complete the construction work is what percent of time taken by a boy to complete the designing work?

एक पुरुष द्वारा निर्माण कार्य को समाप्त करने में लगा समय एक लड़के द्वारा डिजाइनिंग कार्य को समाप्त  करने में लगे समय का कितना प्रतिशत है ?

  1.  65%
  2.  54%
  3.  68%
  4.  ssc-maths-quiz-20-11-19
  5.   None of these/ इनमे से कोई नहीं
Q.5:-what is the average of number of days taken by all the boys to complete the all the works?

सभी लडको द्वारा सभी कार्यों को समाप्त करने में लगे समय का औसत क्या होगा?

  1.  ssc-maths-quiz-20-11-19
  2.  58
  3.  86
  4.  45
  5.  None of These
Q.6: If all the rearrangements of the word MAHENDRAS are considered, what is the probability that E will feature between the H and N ?

यदि शब्द  MAHENDRAS को व्यवस्थित किया जाय तो  E , H और N के मध्य आने की क्या प्रायिकता है?

  1.  1/3
  2.  2/5
  3.  3/8
  4.  1/5
  5.  None of these/ इनमे से कोई नहीं
Q.7:- The questions given below contain two statements giving certain data. You have to decide whether the data given in the statements are sufficient for answering the question? 

What is the area of square whose side is half of the area of rectangle?

(I)   the radius of the circle is equal to length of a rectangle.
(II)  The breadth of the rectangle is equal to 22 cm.

  1.  If both statement together are sufficient, but neither statement alone is sufficient. / यदि दोनों कथन I व II एक साथ पर्याप्त हैं लेकिन अलग-अलग नहीं
  2.   If statement I alone is sufficient but statement II alone is not sufficient./ यदि केवल कथन I ही पर्याप्त है लेकिन केवल कथन II नहीं
  3.  If each statement alone (either I or II) is sufficient. यदि या केवल I या केवल II पर्याप्त हैं।
  4.  If statement I and II together are not sufficient./ यदि I व II दोनों अपर्याप्त हैं।
  5.  If statement II alone is sufficient but statement I alone is not sufficient/यदि केवल कथन II ही लेकिन केवल कथन I नहीं
Q.8:- What will come in the place of question mark (?) in the following number series?

निम्नलिखित संख्या श्रृंखला में प्रश्नचिन्ह (?) के स्थान पर क्या आयेगा?


1698          848          422         208          ?              45

  1.  100
  2.  104
  3.  120
  4.  106
  5.  102
Q.9:- What will come in the place of question mark (?) in the following number series ?

निम्नलिखित संख्या - श्रंखला में प्रश्नचिन्ह (?) के स्थान पर क्या आयेगा ?


20      21      24      29      36      ?

  1.  43
  2.  44
  3.  45
  4.  46
  5.  41
Q.10:- What will come in the place of question mark (?) in the following number series ?
निम्नलिखित संख्या - श्रंखला में प्रश्नचिन्ह (?) के स्थान पर क्या आयेगा?
3            19              115             691               ?               24883

  1. 5948
  2.  4147
  3.  5942
  4.  4146
  5.  None of these/इनमे से कोई नहीं
Answers:
Q.1 sol: - (4) ssc-maths-quiz-20-11-19 Day/दिन

Type of work
Eff. Of MENEff. Of WOMENEff. Of BOYTotal contracts Combined efficiency of all of them (Men + Women + boy)
Construction2341209
Electrification68928823
Painting54216011
Designing56324014
Wood work46536015

 Efficiency of 2men, 1 women and 3 child = 2*4 + 6 + 3* 5 = 29
Work in 10 days = 29 * 10 = 290 work
Remaining work = 360 – 290 = 70 work
Work increased so new work = 130 + 70 = 200 work
New efficiency of men, women and boy = 6, 9 and 10 respectively.
Now in one day work done by all of them = 6*2 + 9 + 3*10 = 51 work

Work to be completed in = ssc-maths-quiz-20-11-19 days = ssc-maths-quiz-20-11-19 

Q.2 Q.:-solution:- (4) 7 : 6
Efficiency of Men for construction, electrification and painting = 6 + 2 + 5 = 13
Efficiency of women for construction, electrification and painting = 3 + 8 + 4 = 15
Efficiency of men  for painting, designing from wood work = 14
Efficiency of  boy for painting, designing from wood work = 10
Required ratio = (13 + 15) : (14 + 10)
= 28 : 24

= 7 : 6

Q.3 solution:- After solving value of x = 3, and y = 2 
Number of days for wood = ssc-maths-quiz-20-11-19  = 24
Number of days for electrification = ssc-maths-quiz-20-11-19
Required ratio = 24: ssc-maths-quiz-20-11-19 

= 23: 12

Q.(4) Solution:- ssc-maths-quiz-20-11-19 Number of days required by a man to complete the construction work = ssc-maths-quiz-20-11-19 = 60 day
Number of days required by a boy to complete the designing work = ssc-maths-quiz-20-11-19 = 80 days

Required percentage = ssc-maths-quiz-20-11-19

Q.5 sol:- No. of days taken by boy to complete the construction work = ssc-maths-quiz-20-11-19 = 30 days/दिन
लडको द्वारा निर्माण कार्य समाप्त करने में लागा समय  = ssc-maths-quiz-20-11-19 = 30 दिन
No. of days taken by boy to complete the electrification work = ssc-maths-quiz-20-11-19 = 32 days
लडको द्वारा विद्युतीकरण  कार्य समाप्त करने में लागा समय  = ssc-maths-quiz-20-11-19 = 32 दिन
No. of days taken by boy to complete the painting work = ssc-maths-quiz-20-11-19 = 80 days
लडको द्वारा पेंटिंग कार्य समाप्त करने में लागा समय  = ssc-maths-quiz-20-11-19 = 80 दिन

No. of days taken by boy to complete the designing work = ssc-maths-quiz-20-11-19 = 80 days
लडको द्वारा डिजाइनिंग कार्य समाप्त करने में लागा समय  = ssc-maths-quiz-20-11-19 = 80 दिन
No. of days taken by boy to complete the wood work = ssc-maths-quiz-20-11-19 = 72 days
लडको द्वारा लकड़ी का  कार्य समाप्त करने में लागा समय  = ssc-maths-quiz-20-11-19 = 72दिन 

Required average = ssc-maths-quiz-20-11-19 = ssc-maths-quiz-20-11-19 = ssc-maths-quiz-20-11-19 days 

Q.6) Solution:- Total arrangements possible = (9!) / 2     -    -------- (1)
E between H and N = (7! ssc-maths-quiz-20-11-19 2) / 2    ---------- (2)
P(E between H and N) = eq (2) / eq (1)
= 1/ 36
हल :- कुल व्यस्था   =. (9!) / 2     -    -------- (1)
कुल व्यस्था जिसमे E H और N के मध्य हो = (7! ssc-maths-quiz-20-11-19 2) / 2    ---------- (2)
कुल प्रयुक्ता जिसमे E H और N के मध्य हो= eq (2) / eq (1)

= 1/ 36

Q.7)Solution:- data inadequate /अपर्याप्त आकंडे 

Q.8 SOLUTION:- 
LOGIC:-  (÷ 2) - 1, (÷ 2) - 2, (÷ 2) - 3, (÷ 2) - 4, (÷ 2) – 5

Q.9 SOLUTION:- 
LOGIC:- + 1, + 3, + 5, + 7, + 9 

Q.10: SOLUTION:- Logic:- ssc-maths-quiz-20-11-19 

0 comments:

Post a Comment

MAHENDRA GURU

Copyright © 2023 www.mahendraguru.com All Right Reserved by Mahendra Educational Pvt . Ltd.