mahendras

| Join Mahendras Telegram Channel | Like Mahendras Facebook Page | Online Admission | Download Mahendras App

Now Subscribe for Free videos

Subscribe Now

Quantitative Aptitude Quiz For IBPS PO Mains | 28-11-19

Durgesh Mahendras
Quantitative Aptitude Quiz For IBPS PO Mains | 28-11-19

Dear Students,


First of all Congratulations to all the IBPS PO Prelims qualified candidates. Mahendras has started special quizzes for IBPS PO Mains examination so that you can practice more and more to secure your spot in the list of mains examination qualified candidates. This IBPS PO Mains special quiz series will mold your preparations in the right direction and the regular practice of these quizzes will be really very helpful in scoring good marks in the Examination.



Direction:- (01-05):- The question given below contains three statements giving certain data. You have to decide whether the data given in the statements are sufficient for answering the question? Mark answer-

निर्देश:- (01-05):- निम्न प्रश्न में कुछ आंकड़ों के साथ तीन कथन दिए गए हैं।  आपको ज्ञात करना है कि दिए गए कथनों में से कौन सा /से कथन उत्तर देने के लिए पर्याप्त है/हैं ?  उत्तर दीजिये - 


Q.1:-what is the area of the hall?
I. Material cost of flooring per square meter is Rs.2.5.
II. Labour cost of flooring the hall is Rs.3500.
III. Total cost of flooring the hall is Rs.14500.


Q.1 हॉल का क्षेत्रफल क्या होगा?
I. फर्श बनवाने में लगे सामान की कीमत 2.5 रुपये/वर्ग मीटर है
II. हाल का फर्श बनवाने में कुल श्रमिक लागत 3500 रुपये है
III. फर्श बनवाने में लगा कुल लागत 14500 रुपये है

  1.  I and II only./ I और II केवल.
  2.  II and III only./II और III केवल
  3.  All I, II and III./ I, II, III सभी.
  4.  Any two of them./ उनमें से कोई दो
  5.  Any one of the three./ तीनों में से कोई नहीं

Q.2:- what is the area of rectangle?
आयत का क्षेत्रफल क्या होगा?


I.Measurement of one diagonal of rectangle is given./आयत का एक विकर्ण ज्ञात  है
II. One side of rectangle is given. / आयत की एक भुजा दी गयी है
III. Cost of fencing around rectangle is Rs.280. / आयत के चारो तरफ बाड़ लगाने की लागत 280 रुपये है


  1.  Only I and II / केवल I और II.
  2.  Only I and III / केवल I और III.
  3.  Any of two / कोई भी दो
  4.  All the statement  is required/ सभी कथन जरूरी है
  5. All statement is insufficient./ सभी कथन अपर्याप्त है

Q.3:- what is the area of isosceles triangle ABC?

I. if one side BC of triangle is given./ यदि त्रिभुज की एक भुजा BC दी गयी है.
II. Side AC is given./ भुजा AC ज्ञात है
III.Angle BAC is given / कोण BAC ज्ञात है.
IV. Side BC is twice the side of AC./ भुजा BC भुजा AC की दोगुनी है  

  1.   Only I II and IV./ केवल I II और IV.
  2.  Only IV./केवल IV
  3.  Only I II and III / केवल I II और III.
  4. All above option are correct/ उपर्युक्त सभी विकल्प सही है
  5.  Can’t be determined/ ज्ञात नहीं कर सकते


Q.4. what is the height of the triangle whose area is equal to the area of rectangle?/ त्रिभुज की उँचाई क्या होगी जिसका क्षेत्रफल आयत के क्षेत्रफल के बराबर है 


  I. Ratio of between length and breadth of rectangle is 5: 4. 
     आयत की लम्बाई और चौड़ाई का अनुपात 5:4.
 II. Base of triangle is 396 / त्रिभुज का आधार 396 सेमी है 

 III. Parameter of rectangle is 1978. / आयत का परिमाप 1978 है 

1. Only I and II / केवल I और II.
2. Only II and III/ केवल II और III.
3. only I and III / केवल I और III.
4. All the statement are necessary / सभी कथन जरुरी है.
5. Can’t be determined / ज्ञात नहीं कर सकते.


Q.5 what is the cost of painting the two adjacent walls of a hall at Rs.5 per square meter. Which has a door and a window dimension regarding length and breadth of door and window is given ?
हॉल की दो समीप की दीवारों को 5 रुपये प्रति वर्ग मीटर पर पेंट करने की लागत क्या है। दरवाजे और खिड़की की लंबाई और चौड़ाई के संबंध में एक दरवाजा और एक खिड़की का आयाम दिया गया है?


I. Area of hall is 240 square meter./ हाल का क्षेत्रफल 240 वर्ग मीटर है 
II. Height, length and breadth of the hall is in the ratio of 5 : 6 : 4.
हल की उचाई, लम्बाई और चौड़ाई का अनुपात 5 : 6 : 4 है
III. Area of one wall is 900 square meter./ एक दीवाल का क्षेत्रफल 900 वर्ग मीटर है. 


1. Only I/ केवल I

2. Only II/ केवल II
3. Only III/ केवल III
4. Either I or III / या तो I या III
5. All the statement is required/सभी कथन जरुरी है



INSTRUCTION: - Study the following table carefully to answer these questions from (6, 7, 8, 9 and 10)./
Total number of employees of a company and number of employees in different departments (in %) and in given years.
निर्देश:- निम्नलिखित टेबल को ध्यान से पढ़े और प्रश्न (6, 7, 8, 9 और 10) का उत्तर दे
एक कंपनी में कुल कर्मचारियों की संख्या और विभिन्न वर्षों में, विभिन्न विभागों में प्रतिशत वार कर्मचारियों की संख्या.



Department /year
Marketing Production Research Account Corporate Total
2015 15% 45% 10% 18% ---- 400
2016 14% --- 9% 19% 16% 500
2017 ---- 46% 14% --- 10% 800
2018 17% 40% 17% 15% --- 1200
2019 20% ---- --- 11% 8% 1500
Total 16IBPS-PO-MATHS-QUIZ-28-11-2019% 44IBPS-PO-MATHS-QUIZ-28-11-2019 % 13IBPS-PO-MATHS-QUIZ-28-11-2019% 14IBPS-PO-MATHS-QUIZ-28-11-2019 10IBPS-PO-MATHS-QUIZ-28-11-2019% 4400

Q.6:- What is the total number of employees in Production, Corporate and Research in all the years together?

सभी वर्षों को मिलाकर उत्पादन, कॉर्पोरेट और अनुसंधान में कर्मचारियों की कुल संख्या क्या है?

  1. 3014
  2. 3100
  3. 3000
  4.   3022
  5.  None of these


Q.7:- Number of employees in Accounts in 2017 is what % more than the number of employee of Marketing in 2015? (approx.)


वर्ष 2017 में एकाउंट्स में कर्मचारियों की संख्या, वर्ष 2015 में विपणन के कर्मचारी की संख्या की तुलना में कितने % अधिक है ? (लगभग 
)

  1.  120%
  2.  123%
  3.  121%
  4.  127%
  5.   None of these/इनमे से कोई ऩही

Q.8:- Total number of employees in Production and Research is how much more than the total number of employees in corporate and marketing?


उत्पादन और अनुसंधान में कर्मचारियों की कुल संख्या कॉर्पोरेट और विपणन में कर्मचारियों की कुल संख्या की तुलना में कितना अधिक है?

  1.  1256
  2.  1236
  3.  None of these
  4.  1346
  5.  1356

Q.9:- Total number of employees in Corporate is how much more/less than the total number of employees in Research?


कॉरपोरेट में कर्मचारियों की कुल संख्या अनुसंधान में कर्मचारियों की कुल संख्या से कितनी अधिक / कम है?

(1) 130 less
(2) 123 more
(3) 135 less
(4) 136 less
(5) 137 more



Q.10:- What is the average number of employees in Marketing, Research and Corporate?

विपणन, अनुसंधान और कॉर्पोरेट में कर्मचारियों की औसत संख्या क्या है?

(1) 587
(2) 468
(3) 598
(4) 568
(5) None of these/इनमे से कोई नहीं

 ANSWER:-

1.solution:-

 All I, II and III./ I, II, III सभी.

2. Solution:- 1 

Only I and II / केवल I और II.


3.Solution:-

 (All above option are correct/ उपर्युक्त सभी विकल्प सही है)

4.Solution:- (4)

 All the statement are necessary / सभी कथन जरुरी है.

5. Solution:- (5)

 All the statement is required/सभी कथन जरुरी है 
CORRECT ANSWER:- 3014

6.Sol :-


Department /yearMarketingProductionResearchAccountCorporateTotal
201560180407248400
201670210459580500
201710436811213680800
20182044801801801321200
20193007201951651201500

Required employee: - = 1958 + 460 + 596 = 3014

Correct answer:- 127%
7.Solution:-(4) IBPS-PO-MATHS-QUIZ-28-11-2019 IBPS-PO-MATHS-QUIZ-28-11-2019 100  = 126.67%

8.Solution :- (5) 

Required answer = 2554 – 1198 = 1356
9.Solution:-

Required number = 596 – 460 = 136


10.Solution: - 
Required average =  IBPS-PO-MATHS-QUIZ-28-11-2019 = IBPS-PO-MATHS-QUIZ-28-11-2019 = 598

0 comments:

Post a Comment

MAHENDRA GURU

Copyright © 2023 www.mahendraguru.com All Right Reserved by Mahendra Educational Pvt . Ltd.